At our June 12, 2024 Meeting the Department of Sanitation presented a plan for stormwater capture and beautification on a short section of Sepulveda Blvd between Haynes St and Lemay St.
The project would include a 7′ wide parkway, 26 parkway swales with irrigation, 27 new trees and more.
The project is currently in the design phase with construction planned for 2025.
North Sepulveda Pedestrian Island – VNNC Presentation 6.12.24