( From State Assemblyman Adrin Narzarian)

BRIDGE RAIL IMPROVEMENT WORK ON US 101

Dear Friends,

The California Department of Transportation (Caltrans) will continue a construction project to upgrade existing bridge rails at multiple locations in both directions along the US 101 Freeway between North Broadway and Highland Avenue.

Due to these critical infrastructure improvements there will be some intermittent nightly ramp closures:

January 25 through February 8

Intermittent nightly closures, Sunday through Friday from 9 p.m. to 6 a.m.

Northbound US 101

North Broadway on-ramp
Southbound US 101

Vine/Franklin off-ramp
Highland Avenue/Cahuenga Boulevard off-ramp
Vine Street/Franklin off-ramp
State Route 110/US 101

Grand Avenue on-ramp to SR-110
Project completion is estimated to be spring 2015.

I apologize for any inconvenience these ramp closures cause you and ask you please bear with Caltrans as we improve our vital transportation system.

Sincerely,

Adrin Nazarian
Assemblymember, 46th District

Website: http://asmdc.org/Nazarian
Email: Assemblymember Adrin Nazarian

Capitol Office:
State Capitol
P.O. Box 942849
Sacramento, CA 94249-0046
Tel: (916) 319-2046
Fax: (916) 319-2146

District Office:
6150 Van Nuys Blvd
Suite 300
Van Nuys, Ca 91401
Tel: (818) 376-4246