BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Van Nuys Neighborhood Council - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Van Nuys Neighborhood Council
X-ORIGINAL-URL:https://vnnc.org
X-WR-CALDESC:Events for Van Nuys Neighborhood Council
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20240310T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20241103T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20250309T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20251102T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20260308T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20261101T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20250610T180000
DTEND;TZID=America/Los_Angeles:20250610T193000
DTSTAMP:20260501T165551
CREATED:20250610T173012Z
LAST-MODIFIED:20250610T173012Z
UID:24927-1749578400-1749583800@vnnc.org
SUMMARY:Caltrans to Host Meeting for the Interstate 405 Sepulveda Pass Pavement Rehabilitation Project
DESCRIPTION:The California Department of Transportation (Caltrans) will hold a virtual\, informational meeting at 6 p.m. Tuesday\, June 10 for the Interstate 405 (I-405) Pavement Rehabilitation Project. \nThis project will extend the pavement life along I-405 in Los Angeles from the communities of Van Nuys to Westwood along with other upgrades and improvements. Construction is scheduled to begin in spring/summer 2025 and last through winter 2028/2029. \nOnce complete\, the approximately $143.7 million project will rehabilitate pavement\, enhance safety features\, and improve pedestrian infrastructure along Interstate 405 (I-405) through the Sepulveda Pass. \nThe improvements will extend along I-405 from Victory Boulevard in the San Fernando Valley to Wilshire Boulevard in West Los Angeles\, which is an essential commuter corridor from northern Los Angeles County and the San Fernando Valley to Los Angeles International Airport\, south bay cities and Orange County. Pavement will be rehabilitated along approximately 92 lane miles including replacing sections between Victory Boulevard and Mulholland Drive and repairing sections of other lanes along I-405 between the project limits. \nThese renovations will enhance motorist’s safety\, ride quality\, and mobility along this stretch of roadway. \nCaltrans will be hosting a virtual\, public meeting with a project presentation on the following:\nTuesday\, June 10 starting at 6 p.m. \nRegister: https://cadot.webex.com/weblink/register/r4772c6e9599488cd8d399750275bc555 \nSign up for notifications about the project using the link below.\nIf you have already signed up and are receiving project emails (including this one)\, please do not sign up again. \nSign Up: https://forms.office.com/g/0RU7MzXNDK \nCaltrans will upgrade about 6\,400 feet of Metal Beam Guardrail (MBGR) to meet current standards. Ten culverts will be improved at several locations along I-405. For pedestrian upgrades\, 10 curb ramps will be upgraded to meet new Americans with Disabilities Act (ADA) standards. Additional improvements include replacing sign panels and overhead sign structures with retroreflective paneling. \nThe project includes the following improvements: \n\nReplace sections of two lanes in each direction from Victory Boulevard to Mulholland Drive and repair sections of other lanes throughout the project limits to optimal surface conditions\nReplace bridge approach/departure slabs in six locations between Mulholland Drive and Wilshire Boulevard\nRestore/Replace 10 culverts\nUpgrade 10 ADA curb ramps at on-and-off-ramps\nUpgrade 6\,400 feet of Metal Beam Guardrail (MBGR)\nReplace 98 sign panels with retroreflective signs and two full-span overhead sign structures\nConstruct new Maintenance Vehicle pullouts (MVPs) at four locations for worker safety\nUpgrade 2.5 miles of existing Fiber Communications Conduit and replace Fiber-Optic Cables\n\nDue to weather or operational reasons\, the schedule is subject to change including the times and dates\, the number of closures and other details. Residents and businesses located near construction may experience noise\, vibrations and dust associated with construction activities. Please visit the Caltrans Quickmap\, at Quickmap.dot.ca.gov\, for the current road conditions and closures.
URL:https://vnnc.org/event/caltrans-to-host-meeting-for-the-interstate-405-sepulveda-pass-pavement-rehabilitation-project/
CATEGORIES:Community
END:VEVENT
END:VCALENDAR